Maeneo ya ukurasa huu ni kwa Kiingereza. Hariri tafsiri
Dinning hall construction at Esperanto Secondary school
A dinning hall with the capacity of accommodating 320 students eating at the same time has been built




20 Februari, 2020
Dinning hall construction at Esperanto Secondary school
A dinning hall with the capacity of accommodating 320 students eating at the same time has been built



